Snapshot
November 06, 2014
U.S. Cellular signs on as naming rights partner for Chicago White Sox

Participating in this sponsorship deal:

Screen shot 2016 02 18 at 10.49.56 am Open uri20141112 64162 y4m5g4?1415808080
Activation Locations
Read More
U.S. Cellular Field(New) Comiskey Park"The Cell"U.S. Cellular Field on Opening Day 2014Former namesComiskey Park (II) (1991–2002)Location333 West 35th StreetChicago, Illinois 60616Coordinates41°49′48″N 87°38′2″W / 41.83000°N 87.63389°W / 41.83000; -87.63389Coordinates: 41°49′48″N 87°38′2″W / 41.83000°N 87.63389°W / 41.83000; -87.63389Public transitSox–35th (CTA station)35th–Bronzeville–IIT (CTA station)Parking8 main parking lotsOwnerIllinois Sports Facilities AuthorityOperatorChicago White Sox Ltd.Capacity40,615 (2004–present)47,098 (2003)45,936 (2001–2002)44,321 (1991–2000)Record attendance47,609July 15, 200374th All-Star GameWhite Sox game: 46,246October 5, 1993Game 1 of the 1993 ALCSPost-renovations: 41,432October 23, 2005Game 2 of the 2005 World SeriesField size(2001–present)Left Field – 330 feet (101 m)Left-Center – 375 feet (114 m) (Not Posted)Center Field – 400 feet (122 m)Right-Center – 375 feet (114 m) (Not Posted)Right Field – 335 feet (102 m)Backstop – 60 feet (18 m)Outfield Wall Height – 8 feet (2 m)(1991–2000)Left Field – 347 feet (106 m)Left-Center – 375 feet (114 m)Center Field – 400 feet (122 m)Right-Center – 375 feet (114 m)Right Field – 347 feet (106 m)Backstop – 60 feet (18 m)Outfield Wall Height – 8 feet (2 m)SurfaceBluegrassScoreboardCenter Field full-color, high resolution video board 28 feet (8.5 m) x 53 feet (16 m) (2003–present)Right Field LED Display out-of-town scoreboard 23 feet (7.0 m) x 68 feet (21 m) (2009–present)Left Field matrix board (2003–present)Fan Deck ticker board (2003–present)2 small scoreboards along the facade down the Right Field and Left Field lines below the 500 levelConstructionBroke groundMay 7, 1989Built1989–1991OpenedApril 18, 1991Renovated2Construction costUS$167 million($289 million in 2015 dollars[1])$118 million (2001–2007 renovations)($134 million in 2015 dollars[1])ArchitectHOK SportHKS, Inc. (2001–2007 renovations)Project managerInternational Facilities Group, LLC[2]Structural engineerThornton TomasettiServices engineerFlack + Kurtz[3]General contractorGust K. Newberg Construction Company[4]TenantsChicago White Sox (MLB) (1991–present)
Read more at en.wikipedia.org/wiki/U.S._Cellular_Field.com »
Comparable Deals
Nearby Deals

View cost of comparable deals

Signup as Professional
Deal Analysis

View Deal Details

Signup as Professional
People

View Deal Makers

Signup as Professional